industrial coal fired 4 mw hot water boiler

58MW SZS series gas-fired industrial coal fired 4 mw hot water boiler project for heating industryPeople cannot live a comfortable life without heating boilers in the winter, the normal and stable heat source is of great importance to human life. What is following is the increasingly serious problem of environmental pollution, implementing the policy of “coal to gas” is no time to delay, using gas-fired hot water boilers has been the general trend. Tianjin Jizhuangzi heat supply center is an enterprise specializing in city heat supply. In order to realize the “green heating”, the heat supply center decided to introduce a branch of gas-fired boilers to replace the old coal-fired boilers. ZOZEN successfully won the trust of Jizhuangzi heat supply center with its own strong comprehensive strength and rich experience in the heating industry. JIzhuangzi chose to cooperated with ZOZEN and ordered 3 sets of 58MW gas-fired hot water boilers (SZS58-1.6/130/70-Q) to provide heating source for citizens. This series of boilers adopts the design of " D " type membrane wall structure, the steam drum, the water drum and convection tube bundle form the convection heating surface to ensure the the boiler expands on both ends as a whole; at the same time, the combustion chamber is designed with the narrow distance tube membrane water cooling wall to reduce heat lost, in addition, the boiler is equipped with a big combustion chamber for the full combustion of fuel, effectively increasing the boiler thermal efficiency over 98% and reducing the NOx to 30mg, which are superior to the national level one energy efficiency standard.

All along, Zhangjiakou City, Hebei Province, took the central environmental protection supervision "look back" as the main problem of feedback opportunities to enhance the ecological environmental protection, pollution prevention and fight tough fight, active rectification, hard to rectify, resolute reform, promote the environmental reform task completed on schedule. We understand that in 2018, Zhangjiakou City Daly to promote projects cut coal, the accelerated clean alternative to coal consumption year on year in 2017 to reduce 1.04 million tons.

For unfinished "2017, the province's energy cut carbon coal down the main points of" cut annual coal requirements of mission objectives problem, Zhangjiakou City, supervisors coal companies cut coal, high quality coal, strengthen energy-saving technological transformation, to fully grasp the total coal consumption control and reduction of bulk coal.

The strengthening of key coal enterprises cut coal, to promote energy-saving technological transformation projects, several key coal enterprises to continuously improve energy standards. And vigorously promote the project minus coal, coal production in 2018 to defuse 8.6 million tons, out of coal-fired boilers 1663 units. Accelerate clean coal alternative, clean winter heating selected pilot cities in northern, rural complete "electricity instead of coal", "substitution of gas for coal" 6971. And vigorously develop renewable energy sources, as of 2018 the city's renewable energy installed capacity of 13,454,800 kilowatts, accounting for 74.2% of all electricity installed capacity, the highest in the country.

First, we need to clear in the boiler "coal to gas" process, to determine the different rehabilitation programs depending on the furnace. Second, grasp the "coal to gas," the key link. 1, removal of the original coal-fired boiler slag machine, coal hopper, coal equipment, chain grate, gearbox and so on. 2, by calculating the heat transfer in the furnace, the furnace geometry is determined, the center position of the furnace flame. Re-casting furnace, furnace refractory concrete casting material used, a large ratio of aggregate: Aggregate: Small aggregate: Sand: = 4:2:1:1:2 refractory cement. After the boiler pipe arch to avoid the flame center position, after the original arch pipe elevation on the basis of the original slope. 3, installation of explosion-proof doors. For gas-fired boiler, the blast doors is an important facility to protect the safe operation of the boiler. 4, boiler water test of 1.25 times the working pressure. Third, no matter what kind of furnace should be noted that in the transformation of the construction of the following questions: 1, should guarantee the smooth flow of flue gas, have a good fullness and should avoid dead ends and dead. 2, the burner should be provided at the height position of the center of the furnace, and the combustion space and has sufficient length. Flame should not be flushed to the wall heating surface, so as to avoid incomplete combustion gases local overheating and damage to the wall. 3, since the combustion gas in the furnace backlash, high thermal strength, exposed to the bottom of the drum in the furnace should be adiabatic process. 4, various pipes, fire tube boiler furnace wall substantially refractory brick masonry, and shield plus insulation material. In the "coal to gas" should pay attention to the tightness of the furnace wall, minimizing the original door, door checks, etc., can assemble the refractory block, prevent cold air flames wounding or excessive leakage into the furnace , affecting boiler efficiency, to see the fire hole must remain closed also should see the fire hole, heat-resistant glass viewing by fire. 5, the furnace boiler and gas than coal-fired boilers, is generally greater, there is sufficient combustion space, increase the volume of gas, does not affect the transformation of combustion conditions. If the user requests output significantly improved boiler, the furnace can be increased radiation heating surface, to remove scale and soot while the inner surface of the outer heating of the original, so that without increasing the volume of the boiler case to improve the boiler output is not a problem. Thermodynamic calculations must do in the boiler, while the smoke but also good wind resistance calculation intensity calculation. Fourth, the correct choice of matching burner

Steam boiler overpressure phenomenon and treatment of steam boilers refers to water heated to a certain temperature parameters and the production of industrial steam boiler, the water in the steam drum is heated to become vapor, fire emits heat in the furnace, it is the principle of the steam boiler. Steam boiler belongs to special equipment, design, processing, manufacturing, installation and use of the boiler must be supervised by technical supervision departments, users only get to use the boiler permits to use steam boilers. The fuel steam boiler (electricity, oil, gas) can be divided into an electrical steam boiler, steam boiler fuel, gas steam boiler three kinds; constructed according to the steam boiler can be divided into vertical, horizontal steam boiler, steam boiler mostly small and medium sized single , double the return of the vertical structure, large steam boilers and more horizontal structure of three return. Steam boilers and boiler overpressure phenomenon processing method, the phenomenon of over-pressure boiler steam pressure ⑴ sharp rise exceeds the allowable operating pressure, the safety valve pressure gauge pointer over the red line pressure is still elevated. When the interlock ⑵ overpressure protection device operation, overpressure alarm should be issued to stop the air blowing, the wind, coal. ⑶ steam temperature rises and steam flow. 2, boiler overpressure treatment ⑴ weakened rapidly burning, manually open the valve or bleed valve. ⑵ increase the water supply, while strengthening the lower drum sewage (you should pay attention to maintaining normal water level boilers), to reduce the boiler water temperature, thereby reducing the pressure drum boilers. ⑶ safety valve pressure gauge malfunction or all of the damage, emergency shutdown, safety valves and pressure gauges are to be repaired after the boost operation. When ⑷ endanger the safe operation of the boiler overpressure occurs, the buck should take measures, but too fast buck is strictly prohibited. The ⑸ serious boiler overpressure eliminate, to the shutdown of the boiler internal and external inspection, to eliminate the overpressure caused by deformation, leakage and other safety accessories and maintenance unqualified.

industrial coal fired 4 mw hot water boiler Related Information

Boiler Product Catalog - zibco.com.tw

2015-9-4 · steam boiler is suitable for industrial and living steam consumption; the correspondent capacity hot water boiler is applied for industrial and civil heating purpose. TP-SZL Series Water Pipe Steam Boiler Item Specification of Package and Shop-assembled Water Tube Coal-fired Boiler TP-SZL4-1.25-All TP-SZL4-1.6-All TP-SZL4-2.45-All

Get a Quote

China Dzl Model 0.7MW 1.4MW 2.8MW 4.2MW

Water Boiler, Hot Water Boiler, Heating Boiler manufacturer / supplier in China, offering Dzl Model 0.7MW 1.4MW 2.8MW 4.2MW 5.6MW 7MW Coal Fired Hot Water Boiler for Greenhouse Heating System, China WDR Horizontal Industrial Electric Steam Boiler Price, Small Scale Package Industrial Firewood Biomass Boilers for Sale and so on.

Get a Quote

10mw supercritical coal fired power plant boiler best

2016-6-28 · Oil and gas fired boiler 1. Cpacity 1-135Ton/ 0.7-58MW 2. Fuel: Natural Gas, LPG, Light Oil, Diesel, Dual Fuel 3. Application: Food Industry, Textile Plant, Hotel, Hospital,Industrial Steam and Hot Water

Get a Quote

58 MW Coal fired CFB boiler to Pakistan,cfb boiler,cfb

2020-6-2 · CFB hot water boiler parameters. Model: QXX58-1.6/150/90-A Rated thermal power: 58 MW Rated water pressure:1.6 MPa Output water temperature: 150 Return water temperature: 90 Design fuel: bituminous coal. 58 MW coal fired hot water boiler for coal industry. 1. High combustion efficiency, energy saving evidently.

Get a Quote

5 mw gas hot water boiler

New Slant/Fin Victory Natural Gas Direct Vent Hot Water Boiler with 120,000 BTU Input, 90,000 BTU Output Model# VSPH-120 $ 2,814 14 $ 2,814 14. Limit 5 per order. The RRG series are natural gas-fired

Get a Quote

Industrial 2.1mw 4.2mw Coal/wood Fired Hot Water

Industrial 2.1mw 4.2mw Coal/wood Fired Hot Water Boiler Made In China, Find Complete Details about Industrial 2.1mw 4.2mw Coal/wood Fired Hot Water Boiler Made In China,Coal/wood Fired Hot Water Boiler,4.2mw Hot Water Boiler,2.1mw Hot Water Boiler from Boilers Supplier or Manufacturer-Henan Province Sitong Boiler Co., Ltd.

Get a Quote

Industrial Horizontal Chain Grate Coal Fired Hot Water

Boiler, Heater, Water Heater manufacturer / supplier in China, offering Industrial Horizontal Chain Grate Coal Fired Hot Water Boiler 2.8MW, 10t H City Gas Steam Generating Boiler Machine for Restaurant School, Low Emission Gas-Fired Wet Back Firetube Hot Water Boiler and so on.

Get a Quote

Coal Fired Hot Water Boiler Manufacturer China--

2020-3-20 · 25 ton coal fired hot water boiler for heating. Best-selling hot water boilers models: WNW 0.7MW ~ 14MW oil and gas fired hot water boiler ZWNS 0.35 MW~ 7MW Vacuum hot water heating boiler SZL 4 ton ~ 30 ton biomass and coal fired hot water boiler DZL 2 ton ~10 ton biomass and coal fired hot water boiler QXX 14MW ~ 168MW CFB hot water boiler

Get a Quote

boiler mw, boiler mw Suppliers and Manufacturers at

china machine for boilers china 150mw china 5 mw china 50mw 532nm china low hot water pressure boiler china fuel coal 2.8mw coal wood boiler 1.4mw water boiler boiler 1mw 4.2mw wood boilers 8 mw hot water boiler 0.7mw fire tube boilers 2 mw boiler 1.4mw coal fired boiler coal power plant mw suppliers central heating coal boiler suppliers boiler

Get a Quote

Coal-fired boilers - Page1 - Products - ZOZEN boiler

Coal-fired boilers Our coal-fired chain grate boilers and coal-fired fluidized bed boilers mainly produce hot water, saturated steam or superheated steam for industrial use. Coal-fired boilers have lower operating costs nearly 50% lower than boilers using oil or natural gas.

Get a Quote

industrial hot water boiler blower -Biomass Boiler Fuel

Hot water air heater Reventon SIMO Industrial Boiler Blower Fan can provide full sets of blower fan products, can meet 1~450T of coal fired boiler, [email protected] > Get A Quote > duel fuel gas & diesel boiler oil furnace feed plan

Get a Quote

ZOZEN Hot Water Boiler - Zozen topic - Zozen Boiler

ZOZEN hot water boilers can be classified into three series by fuels types: gas-fired/oil-fired hot water boilers, coal-fired hot water boilers and biomass-fired hot water boilers. In order to help various industry save more energy and cost, ZOZEN takes the lead in

Get a Quote

ZOZEN Hot Water Boiler - Zozen topic - Zozen Boiler

ZOZEN hot water boilers can be classified into three series by fuels types: gas-fired/oil-fired hot water boilers, coal-fired hot water boilers and biomass-fired hot water boilers. In order to help various industry save more energy and cost, ZOZEN takes the lead in

Get a Quote

COAL FIRED BOILER -PRINCIPALS - Energy Commission

2018-1-8 ·  Initially Malaysias coal fired power stations only used Bituminous coals. Increasing cost has lead to increasing use of lower rank coals which are cheaper and readily available. Existing coal fired boilers can co-fire various grades of sub-bituminous coals. Manjung 4 and TBP 4 designed for 100% lower grade sub-bituminous coals.

Get a Quote

CLSG Coal/Biomass Fired Hot Water Boiler - Coal Fired

Zhongding CLSG coal biomass fired hot water boilers is horizontal water tube structure, the coal or biomass was feed manually, compact structure, energy saving and high thermal efficiency, safe operation, dust can be removed naturally, wide adaptability of different biomass fuels, such as wood chips, rice hull, peanut shell, bagasse, mustard stalk, cotton stalk, etc

Get a Quote

Related Information

Do You Want To Get An Exclusive Project Plan ?

7 * 24 * 365 endless service, click the button to provide you with professional and fast solutions at any time

Scroll to Top