2 ton Gas Fired Industrial Steam Boiler for Food Factory

Steam boiler overpressure phenomenon and treatment of 2 ton fired industrial steam boiler for food factorys refers to water heated to a certain temperature parameters and the production of industrial steam boiler, the water in the steam drum is heated to become vapor, fire emits heat in the furnace, it is the principle of the steam boiler. Steam boiler belongs to special equipment, design, processing, manufacturing, installation and use of the boiler must be supervised by technical supervision departments, users only get to use the boiler permits to use steam boilers. The fuel steam boiler (electricity, oil, gas) can be divided into an electrical steam boiler, steam boiler fuel, gas steam boiler three kinds; constructed according to the steam boiler can be divided into vertical, horizontal steam boiler, steam boiler mostly small and medium sized single , double the return of the vertical structure, large steam boilers and more horizontal structure of three return. Steam boilers and boiler overpressure phenomenon processing method, the phenomenon of over-pressure boiler steam pressure ⑴ sharp rise exceeds the allowable operating pressure, the safety valve pressure gauge pointer over the red line pressure is still elevated. When the interlock ⑵ overpressure protection device operation, overpressure alarm should be issued to stop the air blowing, the wind, coal. ⑶ steam temperature rises and steam flow. 2, boiler overpressure treatment ⑴ weakened rapidly burning, manually open the valve or bleed valve. ⑵ increase the water supply, while strengthening the lower drum sewage (you should pay attention to maintaining normal water level boilers), to reduce the boiler water temperature, thereby reducing the pressure drum boilers. ⑶ safety valve pressure gauge malfunction or all of the damage, emergency shutdown, safety valves and pressure gauges are to be repaired after the boost operation. When ⑷ endanger the safe operation of the boiler overpressure occurs, the buck should take measures, but too fast buck is strictly prohibited. The ⑸ serious boiler overpressure eliminate, to the shutdown of the boiler internal and external inspection, to eliminate the overpressure caused by deformation, leakage and other safety accessories and maintenance unqualified.

Jilin Province is located in northeast China, colder winter. Jilin Province is the autumn and winter air pollution problems are most acute period is the peak period of fog and haze. To reduce the frequency of occurrence of fog and haze, to reduce emissions of air pollution, according to "implement the central Jilin Province Environmental Protection Inspector feedback reform program", Jilin cities to carry out the 2018 autumn and winter special law enforcement inspection of non-electric coal-fired boilers. Specific implementation of the program as follows.

2018 autumn and winter non-electric coal-fired boiler special law enforcement inspection action plan

First, the objectives

Through the "2018 autumn and winter special law enforcement inspection of non-electric boiler coal" action to further increase the intensity of emissions of air pollutants such as excessive penalties for violations combat, urge local governments and environmental protection departments to effectively implement the "Jilin province to implement the central environmental protection inspector feedback reform program, "Forced enterprises to speed up 10 tons of steam coal-fired boilers small and out of more than 20 tons of steam and non-electric coal-fired boiler pollution control facilities upgrade progress to ensure stable discharge standards.

Second, the scope of the inspection

Cities (prefectures) and Changbai Mountain Administrative Committee, Meihekou, Gongzhuling City, Hunchun.

Third, check the time

2018 Nian September 1 to November 30.

Fourth, inspection methods and content

Cities (prefectures) and counties under the jurisdiction of Changbai Mountain Administrative Committee to set up inspection teams to units in the area to take a cross peer review mode, Meihekou, Gongzhuling City, Hunchun to self-oriented.

The principle of mutual cross-check on the environmental violations found, the city's environmental protection departments at all levels in accordance with "should check to make investigation, should make a fine penalty, should be moved to make-shift" of errant given time out of the boiler, not dust removal facilities renovation no construction of desulphurization facilities are not required to install, networking, using automatic monitoring equipment, excessive discharge of pollutants and other acts take full advantage of "environmental law" and supporting measures to implement daily basis penalties, limited production shutdown, sequestration, administrative detention measures to deal with.

Focus on examination of the following:

(A) the progress of 10 tons of steam coal-fired boilers little out of work. According to "implement the central Jilin Province Environmental Protection Inspector feedback reform program," according to the time limit set by local governments, the progress of the phase-out of coal-fired boiler 10 tons of steam since 2014, the province's illegal 1570 newly registered units to be checked.

(B) more than 20 tons of steam coal-fired boiler non-electric dust removal, desulfurization facilities upgrade progress, automatic monitoring equipment installation, networking, usage. By ShengTing 6, July scheduling, the current to complete the rectification stage 717, stage 108 does not start the rectification, the rectification is 277, automatic monitoring equipment table 140 is not installed, the slow progress of the rectification. To complete the transformation around the boiler on-site verification, focusing on inspection facilities dust removal, desulfurization facilities upgrading and installation of automatic monitoring equipment, networking, usage. Percentage being modified, check the current progress of the major transformation of the situation, progress of the project, the time frame for completion, safeguard measures taken, it requires the use of boiler units issued commitments. For failure to start the transformation, to identify the main reason for not starting. If we do not transform the way in which the pin number to take all necessary construction and renovation tasks must be completed in accordance with the requirements of 30 September.

(C) boiler emissions standards. To install automatic monitoring equipment to monitor them than to confirm the validity of the data. For failure to require the installation of automatic monitoring equipment, shall be punished in accordance with relevant laws and regulations, at the same time supervisory monitoring, to determine whether to achieve a stable discharge standards.

Fall and winter heating season is the peak of Jilin Province, to ensure the normal heating units, we must also pay attention to boiler problems in the process of environmental protection. For the high-emission, high-polluting coal-fired boiler and other fuel boiler, to be banned or corrective action.

After the gas hot water boiler hot water boiler vaporization emergency 1. Vaporization handler circulating pump stops abnormally pump failure caused by: ① blower stops running immediately. ② immediately open the door, take measures to pressure the fire, lift the chute gate, cutting off the supply of coal grate. ③ In the case of boiler pressure not greater than 0.6MPa (600KPa), the exhaust valve to follow, only a sharp rise in pressure in the boiler deflated, used only relief exceeds 0.9MPa, and the exhaust process to be carried out slowly, prevention boiler due to loss of pressure and more violently again vaporized. ④ close the boiler water, water main gas valve. ⑤ open stop valve recirculation line, to ensure that the water supply pipe velocity convection heating surface (economizer) to prevent re-vaporization of the economizer. ⑥ The operation of the above operation, at the same time to pay the boiler to reduce the boiler water temperature and the furnace pressure. ⑦ After the boiler pressure is normal, i.e., opening the standby circulating pump, into the normal combustion. 2. Treatment failure or sudden loss of power boiler vaporization of power: ① immediately open the door, lift the coal chute slide gate to take pressure fire measures to reduce the oven temperature. ② Grate with the fastest speed in order in the shortest time to fire onto the slag tap. ③ the degree of treatment in the first case. Once a short time can not supply heating network system, antifreeze should take emergency measures. 3. Due to excessive heat boiler boiler vaporization process: ① the immediate closure of the drum, induced draft fan. ② immediately open the door, take measures to pressure the fire, lift the supply of coal chute slide gate, off of coal, while the grate into fast gear. ③ In the case confirmed the presence of water, the boiler can supply water to the boiler body, boiler out of the water while closing the main valve. ④ Open line stop valve recirculation pump to ensure water velocity convection heating surface of the pipe, to prevent the economizer again vaporized. ⑤ Open circulating pump with jog mode, jog each time less than 30 seconds, again less than one minute jog interval. Jog purpose is to reduce the boiler water temperature, while preventing a large amount of steam into the pipeline system. ⑥ back into place after the safety valve, circulating pump running, and then the normal burning stove. 4. Water boiler system run vaporization process due to water loss, loss of pressure caused by: ① immediately closed drum, induced draft fan. ② out of the water while closing the main valve and the boiler circulating pump. ③ take the same measures to cool the furnace tube described above. ④ Open stop valve recirculation line. ⑤ rely exhaust valve until the safety valve back into place. ⑥ until the boiler water temperature drops below 50 ℃, when the temperature of the furnace temperature less number 200 ℃, again within the boiler feed water, water course to be carried out slowly, to prevent harm to the boiler when the temperature is too large. ⑦ After processing leakage fault, the system time to the replenishment, and out of the water boiler always open the valve, and the circulating pump, and then normal combustion.

1 electric 2 ton fired industrial steam boiler for food factory maintenance, maintenance when the boiler must be cut off and must relief. 2, the burner every two months to be removed from the boiler, carefully remove foreign bodies such as dust and soot. Photocell light-receiving surface wipe once a month, fuel filter should always be kept clean and filtering capabilities; carefully clean the filter in the pump, do not break the seal. Oil-burner not idle, so as not to damage the pump. 3, the water level gauge should always be kept clean, rinse the purge valve is opened, the water level in order to ensure a clear day. 4, pulling the safety valve once a day, to prevent rusting failure. 5, the boiler stops longer running time, cut off the power, and do maintenance work: (1), dry maintenance, shutdown after the release came out water, dirt clean the furnace, slow fire the pot with a burner after drying (burn time not too long, to avoid damage to the boiler), then drain all of the gas boiler, all pipe valve closed, checked every three months. (2), wet maintenance for a period not exceeding one month shutdown of the boiler, furnace shutdown after water release, discharge and clean fill with water, cut off the power, close the valve.

2 ton Gas Fired Industrial Steam Boiler for Food Factory Related Information

2 Ton/hr Gas Steam Boiler Project in Coating Factory,2

2020-5-12 · Paint production requires steam, and 2 ton gas fired boiler can supply good quality steam to meet a coating factorys need. The WNS series gas fired boiler manufactured by ZG Group is an ideal high efficiency and energy saving boiler to replace coal fired boiler.

Get a Quote

China 8 Ton Gas Steam Boiler Prices Supplier and

2020-4-15 · 8 Ton Gas Steam Boiler Prices Manufacturers, Factory, Suppliers From China, Our ultimate target is usually to rank as a top brand also to lead as a pioneer in our field. We are sure our profitable experience in tool generation will gain customer's trust, Wish to co-operate and co-create a far better foreseeable future with you!

Get a Quote

20 Ton Gas Fired Water Tube Boiler for Food &

2020-3-20 · 20 Ton Gas Fired Water Tube Boiler for Food & Beverage 2016-04-26 14:56:57. Steam is the most energy efficient, reliable and flexible way to transfer heat for many food and beverage operations. We, a trustful manufacturer of industrial steam boiler, has the SZS series 20 ton gas fired steam boiler for food & beverage plant.

Get a Quote

1 Ton Oil Gas Fired Steam Boiler for Food Industrial

2020-5-26 · New Type 1 Ton Oil Gas Fired Steam Boiler for Food Industrial Scan the QR code 1 Ton Oil Gas Fired Steam-Boiler advanced three pass wet back design:adopts the most sophisticated three returns all wet back structure,thread smoke tube structure, weld joint with high quality.

Get a Quote

2 Ton/hr Gas Steam Boiler Project in Coating Factory,2

2020-5-12 · Paint production requires steam, and 2 ton gas fired boiler can supply good quality steam to meet a coating factorys need. The WNS series gas fired boiler manufactured by ZG Group is an ideal high efficiency and energy saving boiler to replace coal fired boiler.

Get a Quote

2 Ton Gas Fired Boiler - franziskaner-garten.de

2 ton Gas fired boiler for sale - Gas Fired 10 ton Steam Boiler for Battery factory. 2 ton steam oil gas fired boiler for laundry factory 2 ton steam oil gas fired boiler for laundry factory Chapter 2: Definitions, Mechanical Code of the Texas Unless otherwise expressly stated, the following words and terms shall, for the purposes of this code, have the meanings indicated in this chapter .

Get a Quote

Gas&Oil Boiler Project, Gas fired boiler project/case

2020-5-12 · Waste Heat Boiler; Industrial Autoclave; 3 Tons Steam Boiler Exported to Russia 8 Tons WNS Gas Steam Boiler Project in China. Application: steam supply. Capacity: 8 ton. 65 Ton Gas Fired Power Plant Boiler Project. Application Application: 10 ton. Capacity: Heating for school. 6 Ton Steam Boiler Used in Food Factory. Application: steam

Get a Quote

Steam Boiler_Hot Water Boiler_Industrial Boiler

Henan Taiguo Boiler offer various industrial boilers, including Gas & Oil Fired Boiler, Coal Fired Boiler, Biomass Fired Boiler, Electric Heating Boiler, Thermal Oil Boiler,Steam Generator, Pressure Vessel, Hot Air Furnace, etc. Our products have been exported to more than 80 countries all over the world.

Get a Quote

Gas/Lpg/Oil Boiler, Steam/Water Boiler

2020-6-6 · Generally, Boilers will work for heating system and drying system, our steam boiler/hot water boiler/thermal oil boiler can satisfy these heating/drying request, so if your factory/clients will need boiler, send your details: boiler usage/ boiler capacity/ boiler power, then we make boiler solution for you specially. Gas/oil fired thermal oil

Get a Quote

China Gas Boiler manufacturer, Steam Boiler, Hot

YinYu boiler manufacturing Co., Ltd. is a national fixed-point B boiler pressure vessel manufacturer, our main products are: Vertical coal, gas, fuel steam (hot water) boiler, environmental protection double grate type steam boiler burning, electric heating steam boiler (hot water) boiler, vertical airborne hot, high, medium and low temperature hot blast stove, etc 16 big series, 153 kinds of

Get a Quote

Henan Yuanda Boiler Corporation Ltd.,

2020-3-14 · Henan Yuanda Boiler Corporation Ltd., was established in 1956. We are professional manufacturer and supplier for coal fired boiler,gas fired boiler,biomass fired boiler,wood chip fired boiler,oil fired boiler,steam boiler,fire tube boiler,industrial boilers.

Get a Quote

2 tons of gas steam Industrial Boiler Coal Fired Hot

2020-3-18 · Natural Gas Fired Boiler,10 ton Natural Gas Fired . 2019-4-8 · And this water tube boiler will be used in food factory for steam generation. In Dec 2016, Peru clients and signed a sales contact of SZS 10 ton natural gas fired steam boiler. Background. SZS series boiler is a kind of packaged boiler, very convenient to transport.

Get a Quote

Gas&Oil Boiler Project, Gas fired boiler project/case

2020-5-12 · Waste Heat Boiler; Industrial Autoclave; 3 Tons Steam Boiler Exported to Russia 8 Tons WNS Gas Steam Boiler Project in China. Application: steam supply. Capacity: 8 ton. 65 Ton Gas Fired Power Plant Boiler Project. Application Application: 10 ton. Capacity: Heating for school. 6 Ton Steam Boiler Used in Food Factory. Application: steam

Get a Quote

2 ton coal fired steam boiler for instant noodle factory

woodair boiler noodle factory Industrial Steam Boiler. There are 735 noodle boiler suppliers, mainly located in Asia. The top supplying countries are China (Mainland), Singapore, and Taiwan, which supply 99%, 1%, and 1% of noodle boiler respectively. 2 ton coal fired steam boiler for instant noodle factory. 2 ton coal fired steam boiler for instant noodle factory.

Get a Quote

Yaohua Glass Factory 2 Ton Steam Boiler

Industrial Boiler Projects Qinhuangdao Yaohua Glass Industrial Park Co., Ltd Model: WNS2-1.25-YQ Project Location: Qinhuangdao, China Installation Date: January 2016 Application: Glass Manufacturing Capacity: Steam 2 t/h Rated Pressure: 1.25 Mpa Thermal Efficiency: >98% Heating Source: Oil and Natural Gas Qinhuangdao Yaohua Glass Industrial Park Co., Ltd. is a company specializing in the

Get a Quote

Related Information

Do You Want To Get An Exclusive Project Plan ?

7 * 24 * 365 endless service, click the button to provide you with professional and fast solutions at any time

Scroll to Top